Abrasive basting:

Abrasive blasting creates an enormous amount of pollutants as particles of the blasting medium are projected. In an effort to contain the blasting material, the process must be completed in an enclosed space. Traditionally scaffolding would be erected and wrapped to create an enclosed environment to blast in. This method requires 2-3 days just for set-up and can cost between 7-10 thousand dollars. Many companies have begun to consider alternative methods of containing their abrasive blasting to reduce the time required to erect their blasting enclosure and reduce the ongoing cost of such blasting enclosures. Giant Inflatables Industrial has advanced methods for reducing these times and costs and has helped word leaders such as Siemens and Origin Energy do just that.